DAFORMS.NET – DA FORM 7805 – Industrial Mobilization Capacity (IMC) Requirements For Manufacturing Facilities – In order to ensure production during a mobilization, the Department of Defense (DOD) requires all manufacturing facilities that support the defense industry to submit a DA Form 7805. This form provides information on the Industrial Mobilization Capacity (IMC) of the facility, as well as any special manufacturing processes or equipment. The IMC is a measure of the ability of a facility to increase production in support of the national defense.
Download DA FORM 7805 – Industrial Mobilization Capacity (IMC) Requirements For Manufacturing Facilities
Form Number | DA FORM 7805 |
Form Title | Industrial Mobilization Capacity (IMC) Requirements For Manufacturing Facilities |
Published | 06/01/2018 |
Prescribing Pub | – |
File Size | 31 KB |
What is a DA FORM 7805?
The Department of Defense (DOD) is responsible for ensuring that the United States has the ability to mobilize its resources in the event of a national emergency. The Industrial Mobilization Capacity (IMC) requirements are one way that the DOD ensures that manufacturing facilities are able to meet the needs of the military in a time of crisis. The IMC requirements are designed to assess a facility’s ability to expand production, modify processes, and change product mix in order to support the mobilization effort.
Where Can I Find a DA FORM 7805?
The Department of Defense (DOD) is responsible for ensuring that the United States has the capacity to mobilize its industrial base in the event of a national emergency. The Industrial Mobilization Capacity (IMC) requirement is a measure of that capacity. The IMC requirement is expressed as a percentage of the total production capacity of a manufacturing facility that can be made available for DOD contracts in the event of a mobilization.
DA FORM 7805 – Industrial Mobilization Capacity (IMC) Requirements For Manufacturing Facilities
The Department of Defense (DoD) is responsible for ensuring that the manufacturing and industrial base supporting the warfighter is ready to respond to a wide range of contingencies. The Department has long recognized the need to assess and report on the manufacturing and industrial capability of the United States. In an effort to streamline and improve this process, the DoD has developed the DA Form 7805 – Industrial Mobilization Capacity (IMC) Requirements for Manufacturing Facilities.